The intersection where Highway 99W meets Roy Rogers Road and Tualatin-Sherwood Road is being improved. This project includes installation of a Willamette Water Supply pipeline. Construction began in 2021.

The Tualatin-Sherwood Road - Roy Rogers Road intersection with Highway 99W has a lot of traffic, especially during commute times, and is expected to have more traffic in the future.

This project improves traffic flow and safety for vehicles, pedestrians and bicyclists on Tualatin-Sherwood - Roy Rogers Road from Borchers Drive to Langer Farms Parkway (formerly Adams Avenue). We are:

  • Widening Tualatin-Sherwood Road to add two westbound through lanes
  • Widening Tualatin-Sherwood Road, east of Langer Farms Parkway, to add a second eastbound through lane beyond the Langer Farms intersection.
  • Improving the Highway 99W intersection by:
    • Adding two eastbound-to-northbound dual left-turn lanes
    • Adding a westbound through-lane
    • Adding an eastbound-to-southbound dedicated right-turn lane
    • Adding a southbound-to-westbound dedicated right-turn lane
    • Widening Highway 99W to add a northbound lane from Tualatin-Sherwood Road to Langer Farms Parkway
    • Adding of bike lanes on both sides of Tualatin-Sherwood Road, between Borchers Drive and Langer Farms Parkway

We are partnering on this project with Willamette Water Supply System's new water supply line installation.

Construction start: Sept. 9, 2021
Construction finish (expected): October 2024

Sign up to receive project updates by email 

Update

4/12/2024: Construction is on-going. Expected traffic signal shutdowns and lane closures 7 p.m.-5 a.m. and intermittent lane closures 9 a.m.-4 p.m. weekdays.

Also see:

Roy Rogers Road (Chicken Creek to Borchers Drive)

Tualatin-Sherwood Road (Langer Farms Parkway to Teton Avenue)

Funding

Cost Estimate: $37.9 million

Funding Sources:

Prior events and comment opportunities

Construction kickoff open House: Aug. 21, 2019

Open House: Oct. 16, 2013
Location: Sherwood Police Station
Topic: Learn about the selected design option

Neighborhood Meeting: July 17, 2013
Location: Sherwood Police Station
Topic: Discuss addition of two proposed roads north of Tualatin-Sherwood Road

Open House: July 11, 2012
Location: Sherwood Police Station
Topic: Introduce Tualatin-Sherwood Road Project

Contact(s)

Back to top