149th Avenue (Watershed Lane to Farmington Road)

We will complete sidewalks along 149th Avenue to provide safer pedestrian access to local schools, parks and commercial areas.

We will build sidewalks along the east side of 149th Avenue between Watershed Lane and Farmington Road.

Improvements may include:

  • 5-foot wide sidewalk on the east side of the street
  • Connection to existing sidewalk north and south of the project
  • Concrete or asphalt driveways connecting to existing driveways
  • Stormwater drainage improvements

Design start: Spring 2025
Design finish (expected): Summer 2026
Construction start (expected):Fall 2026
Construction finish (expected): Fall 2026

Sign up to receive project updates by email

Update

04/10/2026: We have reached 60% design. Thank you to those who visited our recent online open house and shared opinions and questions with us. In many cases we responded directly. We are also sharing responses to some questions in the FAQs below.

Prior comment opportunity

Online open house, March 27 - April 10, 2026

Funding

Cost Estimate: $400,000 (2024 estimate)

Funding source : Road Fund

Major Streets Transportation Improvement Program (MSTIP)
Planned detour route during 149th Avenue construction

FAQs

The east side was chosen as it would provide a complete sidewalk to Farmington Road from the neighborhood with the new sidewalk connecting to existing segments of sidewalk.

The 149th Avenue project includes the addition of "no parking" signs along the east side of the road. As a result of community requests, we consulted with our traffic engineers and determined that we are not able to apply similar signage to the west side of 149th Avenue.

The County works with the school district in advance of the project going to construction bid. Then before construction starts, the County provides a notification of dates and times of work and any detours or traffic limitations to the school district.

The construction contractor will work with the Postmaster to determine mailbox location during construction. Mailboxes will be relocated/reconstructed per instruction by the Postmaster.