We’ve detected a landslide about three-fourths of a mile from the end of the pavement on Bacona Road.
The unstable slope is causing erosion at the edge of the road. We will stabilize the landslide and repair the road where needed.
Construction start (expected): September 2023
Update
5/4/2023: The right-of-way acquisition process is underway.
Funding
Cost: $405,000 (estimate)
Funding sources:
Contact(s)