Edy Road (Borches Drive to Copper Terrace) Pedestrian Improvement

Edy Road will be improved from Borcher Drive to Copper Terrace.

This project will improve pedestrian and driver safety on Edy Road by bringing the road up to current standards, with connected sidewalks and bike lanes on both sides of the street, planter strips, street lighting, stormwater collection and water quality treatment.

Edy Road will be updated to urban design standards.

  • Improved pedestrian and driver safety
  • Continuous bike lanes (both sides of street)
  • Continuous sidewalks (both sides of street)
  • Planter strips
  • Stormwater collection and water‑quality treatment
  • Brings roadway up to current urban standards

Design start: August 2025
Construction start (expected): October 2026
Construction finish (expected): Spring 2027

(Dates subject to change.)

Update

06/30/2026: A realignment feasibility study of Elwert and Edy roads is currently underway. The outcomes of that study will influence the approach to this project.

A local map showing the location of proposed improvements on Edy Road between Borchers Drive and Copper Terrace

Commissioner District 3

Funding

Cost estimate: $14.2 million

Funding source: Major Streets Transportation Improvement Program (MSTIP 3f)

Commissioner District: 3

Major Streets Transportation Improvement Program (MSTIP)

Contact(s)