Laidlaw Road and Waterhouse Trail (FY 2022-24 Pedestrian & Biking Improvement)

There is no pedestrian crossing where Waterhouse Trail crosses Laidlaw Road.

We will add a crosswalk, signs, road striping and curb ramps.

A Rectangular Rapid-Flashing Beacon (RRFB) will be installed to alert drivers when someone is in the crosswalk. RRFBs are crossing signals with blinking lights that turn on when a pedestrian presses a button.

This project is part of a larger effort to connect sidewalks and walkways in the Bethany area.

To ensure cost-efficient construction, this project is being designed and constructed alongside:

Construction start (expected): Winter 2025
Construction finish (expected): Summer 2025

Update

5/28/2024:  Design is 50 percent complete.

Funding

Cost: $180,000 (2022 estimate)

Funding source:

Urban Road Maintenance District (URMD)

 