Skip to main content

Bethany Boulevard and Mitchell Avenue (FY 2022-24 Pedestrian & Biking Improvement)

The intersection of Bethany Boulevard and Mitchell Drive doesn’t have a pedestrian crossing.

We will add a crosswalk, signs, road striping and curb ramps.

A Rectangular Rapid-Flashing Beacon (RRFB) will be installed to alert drivers when someone is in the crosswalk. RRFBs are crossing signals with blinking lights that turn on when a pedestrian presses a button.

This project is part of a larger effort to connect sidewalks and walkways in the Bethany area.

Construction start (expected): Spring 2024
Construction finish (expected): Summer 2024

Update

5/15/2023: Design is underway for this project.

Funding

Cost: $200,000 (2021 estimate)

Funding source:

Urban Road Maintenance District (URMD)

Contact(s)