We will design a replacement bridge for 205th Avenue at Beaverton Creek.
We will begin with a traffic analysis to determine if the road needs to be widened to three lanes (one motor vehicle travel lane in each direction and a center turn lane) or five lanes (two motor vehicle lanes in each direction with a center turn lane).
Additional improvements include:
- Bike lanes
- Sidewalks
- Retaining walls
- Guardrails
- Street lights
- Improved storm drainage
- Storm water treatment facilities
Design start: September 2022
Design finish (expected): November 2023
Construction: Pending construction funding
Sign up to receive project updates by email
Update
5/23/2023: We are about 30% through design. Project is on hold until further funding is obtained.
Funding
Cost: $3.5 million (2021 estimate)
Funding source: Major Streets Transportation Improvement Program (MSTIP 3e)