We will replace the temporary culverts with a single metal pipe.
At the same time, we will rebuild the road base to fill any voids that resulted from the previous culvert failure and were not addressed during the emergency repairs. The culverts are located near milepost 0.4.
Dixie Mountain Road will remain open with lane closures during construction.
Construction start (expected): August 29, 2022
Construction finish (expected): September 29, 2022
Update
Construction on this project is complete.
Funding
Cost: $362,000
Funding source: