SW Dober Road, between Iowa Hill and Riedweg roads, will close Sept. 21-Oct. 11 for culvert installation.
The project, originally scheduled to begin Sept. 14, was delayed due to wildfire and poor air quality causing unsafe conditions for crews.
The existing bridge needs repairs and will be replaced with a reinforced concrete box culvert sized for high water, the local drainage basin and improved passage for native migratory fish.
Construction start (expected): 09/14/2020
Construction finish (expected): 10/11/2020
Update
This project is complete.
Funding
Cost: $350,000 (2020 estimate)
Funding sources:
Contact(s)
Name | Title | Phone | |
---|---|---|---|
Capital Project Services |