We will rebuild the roadway through a process called full depth reclamation. Full depth reclamation is a process that crushes roadways that have reached the end of their life cycle. The materials are recycled on-site to rebuild strong, cost-effective roads.
Work will result in a two-week long road closure. A signed detour around the closure will be provided.
Construction start (expected): June 12, 2023
Construction end (expected): June 26, 2023
Update
6/26/2023: This project is complete.
Funding
Cost: $410,000 (estimate)
Funding sources:
Contact(s)
Name | Title | Phone | |
---|---|---|---|
Road Maintenance |