A culvert on John Lee Road is aging and in need of replacement.

We plan to replace the failing culvert with a new four-foot diameter corrugated metal pipe. The replacement will ensure continued water flow and prevent damage to the road.

Construction start (expected): Summer 2023
Construction finish (expected): Fall 2023

Update

5/4/2023: The design process is underway.

Funding

Cost: $250,000 (estimate)

Funding source:

​​​Road Fund