We plan to replace the failing culvert with a new four-foot diameter corrugated metal pipe. The replacement will ensure continued water flow and prevent damage to the road.
Construction start (expected): Summer 2023
Construction finish (expected): Fall 2023
Update
5/4/2023: The design process is underway.
Funding
Cost: $250,000 (estimate)
Funding source:
Road Fund
Contact(s)
Name | Title | Phone | |
---|---|---|---|
Road Maintenance |