The outlet of the existing culvert is failing and undermining the road slope guardrail.
The project will replace the existing culvert with a new culvert sized for the stream and repair the road. Old Highway 47 will be closed during construction.
Construction start (expected): Aug. 8, 2025
Construction finish (expected): Sept. 5, 2025
Update
9/11/2025: Old Highway 47 has reopened and this project is substantially complete.
Funding
Cost: $580,000 (estimate)
Funding source: