Tualatin-Sherwood Road, between Teton Avenue and Langer Farms Parkway, is a major intersection with a lot of traffic. We are widening it to improve both current and future traffic.
The project includes:
- Five travel lanes (two travel lanes in each direction and a center-turn lane)
- Bicycle and pedestrian facilities on both sides of the road
- Storm drainage upgrades and water treatment facilities
- Street lights
We are partnering on this project with the Willamette Water Supply System (WWSS) new 66-inch drinking water pipeline installation.
Construction start: July 2022
Construction finish (expected): October 2025
Sign up to receive project updates by email
Update
7/13/2023: Expect intermittent traffic signal shutdowns and lane closures 9 p.m.-5 a.m. Expect delays.
Also see:

CPO 5 (inactive)
Commissioner District 3
Funding
Cost: $71.5 million (estimate)
Funding sources:
Prior events and comment opportunities
Online construction kickoff: July 8-31, 2022
Open house: Aug. 21, 2019